dc.contributor.author | Yekeler M. | |
dc.contributor.author | Ulusoy U. | |
dc.contributor.author | Akbaba I. | |
dc.date.accessioned | 2019-07-27T12:10:23Z | |
dc.date.accessioned | 2019-07-28T09:13:15Z | |
dc.date.available | 2019-07-27T12:10:23Z | |
dc.date.available | 2019-07-28T09:13:15Z | |
dc.date.issued | 2000 | |
dc.identifier.issn | 0167-4528 | |
dc.identifier.uri | https://dx.doi.org/10.1016/S0167-4528(00)80021-6 | |
dc.identifier.uri | https://hdl.handle.net/20.500.12418/4653 | |
dc.description.abstract | The breakage parameters of a run of mine chromite for dry and wet ball milling were obtained by means of standard S and B test methods. This method requires a small amount of power for grinding for different length of time in a laboratory ball mill to obtain the breakage parameters. The single sized fraction of a - 425 + 250 ?m feed of material obtained from our laboratories was ground for different lengths of time in a laboratory ball mill. The specific rate of breakage, (Si), for dry milling was determined to be 0.28 min-1, while the Si value for wet grinding was 0.56 min-1. The cumulative breakage-distribution function (Bij) values (?{symbol}, ? and ?) obtained were the same for dry and wet ball milling. The, ? and ? values were 0.75, 1.14 and 7.9, respectively. The simulation of the product-size distributions using a "Two-Stage Ball-Mill Circuit Simulator: PSUSIM" was performed by making use of the obtained S and B parameters. The simulated results were in good agreement with the experimental results. © 2000 Elsevier B.V. All rights reserved. | en_US |
dc.language.iso | eng | en_US |
dc.publisher | Elsevier | en_US |
dc.relation.isversionof | 10.1016/S0167-4528(00)80021-6 | en_US |
dc.rights | info:eu-repo/semantics/closedAccess | en_US |
dc.subject | ball milling | en_US |
dc.subject | chromite | en_US |
dc.subject | grinding kinetics | en_US |
dc.subject | simulation | en_US |
dc.title | Breakage parameters of chromite and simulation of the product-size distributions | en_US |
dc.type | article | en_US |
dc.relation.journal | Developments in Mineral Processing | en_US |
dc.contributor.department | Yekeler, M., Department of Mining Engineering, Cumhuriyet University, 58140 Sivas, Turkey -- Ulusoy, U., Department of Mining Engineering, Cumhuriyet University, 58140 Sivas, Turkey -- Akbaba, I., Department of Mining Engineering, Cumhuriyet University, 58140 Sivas, Turkey | en_US |
dc.identifier.volume | 13 | en_US |
dc.identifier.issue | C | en_US |
dc.identifier.endpage | C4-21 | en_US |
dc.identifier.startpage | C4-16 | en_US |
dc.relation.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | en_US |