Show simple item record

dc.contributor.authorErdem B.
dc.contributor.authorÇelebi N.
dc.date.accessioned2019-07-27T12:10:23Z
dc.date.accessioned2019-07-28T09:13:21Z
dc.date.available2019-07-27T12:10:23Z
dc.date.available2019-07-28T09:13:21Z
dc.date.issued1999
dc.identifier.issn0317-0926
dc.identifier.urihttps://hdl.handle.net/20.500.12418/4680
dc.description.abstractAn important problem associated with tandem dragline systems is that of matching the productive capability of individual draglines in the combination. In this paper, a dependence mechanism among draglines in a tandem system is described, and possible consequential problems in a poorly-matched system are defined. The rate of linear advance and the cost of stripping are determined as two major indications for an efficient operation. The proposed decision criteria and the underlying mechanism to select a synchronous couple are introduced and used in simulating tandem dragline systems. The developed model is tested on a hypothetical strip mine where pullback stripping is applied with a tandem dragline system.An important problem associated with tandem dragline systems is that of matching the productive capability of individual draglines in the combination. In this paper, a dependence mechanism among draglines in a tandem system is described, and possible consequential problems in a poorly-matched system are defined. The rate of linear advance and the cost of stripping are determined as two major indications for an efficient operation. The proposed decision criteria and the underlying mechanism to select a synchronous couple are introduced and used in simulating tandem dragline systems. The developed model is tested on a hypothetical strip mine where pull-back stripping is applied with a tandem dragline system.en_US
dc.language.isoengen_US
dc.publisherCIM, Montreal, Canadaen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectCoal miningen_US
dc.subjectDraglinesen_US
dc.subjectEquipmenten_US
dc.titleA method to synchronize the tandem dragline systemsen_US
dc.typearticleen_US
dc.relation.journalCIM Bulletinen_US
dc.contributor.departmentErdem, B., Mining Engineering Department, Cumhuriyet University, Sivas, Turkey -- Çelebi, N., Mining Engineering Department, Middle East Technical University, Ankara, Turkeyen_US
dc.identifier.volume92en_US
dc.identifier.issue1029en_US
dc.identifier.endpage61en_US
dc.identifier.startpage55en_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record