Show simple item record

dc.contributor.authorErdem B.
dc.contributor.authorDuran Z.
dc.date.accessioned2019-07-27T12:10:23Z
dc.date.accessioned2019-07-28T09:32:35Z
dc.date.available2019-07-27T12:10:23Z
dc.date.available2019-07-28T09:32:35Z
dc.date.issued2013
dc.identifier.isbn9781632662989
dc.identifier.urihttps://hdl.handle.net/20.500.12418/5578
dc.descriptionChamber of Mining Engineers of Turkeyen_US
dc.description16 April 2013 through 19 April 2013 -- Antalya -- 105453en_US
dc.description.abstractThis study addresses the use of combined stripping systems to investigate the technical feasibility of extracting level -lying thick coal seams underlying deep overburden strata. The possibility of using multiple draglines in tandem with bucket wheel excavator systems is explored. Considering the depth of overlying strata, application of terrace mining and excavation of a large part of the overburden by employing a triple dragline excavation fleet, two of which are deployed on the highwall side and the third one on the spoil side, is planned. The uppermost part of the overburden is to be excavated and transported across the pit via a bucket wheel excavator-cross pit spreader sub-system. With approximately 4×109 t of lower-calorific value of lignite reserves, Afşin-Elbistan lignite basin holds a large potential for electrical energy production in Turkey. The basin is divided into sectors of approximately 750×106 t lignite tonnages. Based on average coal and overburden thickness terms a 25×106 t of lignite production per annum is projected with some 50×106 m3 of overburden to be moved. A production simulation algorithm, which emphasizes synchronizing excavator units in the triple dragline system, is developed. The model is tested with the data from Sector-D of Afşin-Elbistan lignite basin and several dragline-BWE-XPS combinations that may successfully perform overburden stripping at the predetermined rate and uncover coal seams are obtained.en_US
dc.language.isoengen_US
dc.publisher23rd International Mining Congress and Exhibition of Turkey, IMCET 2013en_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.titleDeployment of a multiple-dragline fleet to extract thick coal seams under deep overburden [Derin örtü alti{dotless}ndaki kali{dotless}n kömür damarlari{dotless}ni{dotless}n çi{dotless}karti{dotless}lmasi{dotless}nda çoklu çekmekepçe örtükazi{dotless} sistemlerinin kullani{dotless}mi{dotless}]en_US
dc.typeconferenceObjecten_US
dc.relation.journal23rd International Mining Congress and Exhibition of Turkey, IMCET 2013en_US
dc.contributor.departmentErdem, B., Cumhuriyet Üniversitesi, Maden Mühendisli?i Bölümü, Sivas, Turkey -- Duran, Z., Cumhuriyet Üniversitesi, Sivas Meslek Yüksekokulu, Sivas, Turkeyen_US
dc.identifier.volume1en_US
dc.identifier.endpage54en_US
dc.identifier.startpage41en_US
dc.relation.publicationcategoryKonferans Öğesi - Uluslararası - Kurum Öğretim Elemanıen_US


Files in this item

FilesSizeFormatView

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record